|
June 2007 – Two Years on and GT
Group Report Great Results With Powerway and SinglePoint. Heavy
commercial vehicle parts manufacturer GT Group set out to get ahead of the
game back in 2005 when they purchased and implemented Powerway
software for Advanced Product Quality Planning (APQP). Now, two years down
the line, they are very happy to report back that the software is doing
exactly what they hoped it would do – save time, increase efficiency and
delight their customer. John Bendelow, Quality Manager for the Peterlee
based engineering company, reports that “The documents we are submitting to
customers are drawing a lot of positive comments and praise. We had a
customer on-site a little while back for an audit and they took a long look
into the way we are using Powerway to manage our APQP and PPAP process and
they were really impressed with what they saw – so much so that they told us
that we were “streets ahead” of even themselves – which is great hear!” Managing
all of the other associated documentation can also be achieved through
Powerway and GT have made great strides into better controlling critical
documentation by importing nearly all of their CAD drawings into
Powerway. Wayne Allen, Design Manager
for GT, says “All the people involved in using Powerway all really like using
the tool – they find it very easy to find what they’re looking for because
they just type the part reference into the Quick Search field and up it
comes. And because of the control Powerway offers I know that they can only be
accessing the very latest version”. About
one year after purchasing Powerway from Syncronology (Powerway’s exclusive About
GT Group Ltd
|
|||||||